LH2 Vacuum Jacket Piping for LH2 Plant

  • 진공단열배관

Customer :

SK Ecoengineering
  • Purpose : LH2 Liquefying Plant
  • Technical Features : Welding type connection

     – Size (Inner/Outer), Length

       ㆍRunDown Line : 6˝/10 ˝, 258 m

        . RunDown Line : 3˝/6˝, 576 m

        . Extract Line      : 4˝/6˝, 803 m

        . Tank Boil Off  Line : 2˝/4˝, 647 m

        . LN2 Line           : 1.5˝/4˝, 318m

     – Design Pressure :  12.2 & 18 barg