액화수소 플랜트용 진공단열배관

  • 진공단열배관

Customer :

SK Ecoengineering
  • Purpose : LH2 Liquefying Plant
  • Technical Features : Welding type connection

     – Size (Inner/Outer), Length

       . RunDown Line : 6˝/10 ˝, 258 m

       . RunDown Line : 3˝/6˝, 576 m

       . Extract Line      : 4˝/6˝, 803 m

       . Tank Boil Off  Line : 2˝/4˝, 647 m

       . LN2 Line           : 1.5˝/4˝, 318m

     – Design Pressure :  12.2 & 18 barg

액화수소 플랜트용 진공단열배관

  • 진공단열배관

Customer : 

SK Ecoengineering
  • Purpose : LH2 Liquefying Plant
  • Technical Features : Welding type connection

     – Size (Inner/Outer), Length

       . RunDown Line : 6˝/10 ˝, 258 m

       . RunDown Line : 3˝/6˝, 576 m

       . Extract Line      : 4˝/6˝, 803 m

       . Tank Boil Off  Line : 2˝/4˝, 647 m

       . LN2 Line           : 1.5˝/4˝, 318m

     – Design Pressure :  12.2 & 18 barg